Skip to content
Monday – Friday: 7 a.m. – 4 p.m. · Saturday – Sunday: ClosedMonday – Friday: 7 a.m. – 4 p.m.Electrical Contractor · MT Lic. 000000General liability insurance
1 more license
  • Electrical Contractor · MT Lic. 000000
  • General liability insurance
(406) 555-0103

Kalispell, Montana

Jobs

Solar and battery tie-in

We wire the system and meet the utility steps with you. We do not sell panels or batteries.

A net-zero house makes about as much power over a year as it uses, and keeps the lights on when the grid is down. The panels get the attention. The wiring is what the inspector and the utility read.

We do the electrical side: the inverter, the disconnects, the battery and the connection to your panel.

A solar microinverter with its cables laid on a white metal roof panel

When you need it

Signs this is the job

  • You are building a net-zero house

    The wiring should be planned with the load, so the battery and panels fit the house.

  • You have panels and want a battery

    Adding a battery changes the panel, the disconnects and the drawing.

  • The grid fails every winter

    A battery with a back-up circuit keeps the well, the freezer and the heat running.

  • Your utility has paperwork

    Interconnection applications have their own steps and a waiting time, so we start early.

  • The inspector wants a drawing

    We make one that shows every source and every disconnect.

  • You are unsure what to buy

    We tell you which brands we are willing to wire, before you order.

The visit

From site visit to switch-on

  1. 01

    Step 1: Site visit

    We look at the roof or the ground array site, the panel and the meter.

  2. 02

    Step 2: Drawing and utility application

    The one-line drawing, and the utility paperwork started with you.

  3. 03

    Step 3: Wiring

    Disconnects, the inverter, the battery and the tie-in to your panel.

  4. 04

    Step 4: Inspection

    The inspector reads the labels and the drawing at each source.

  5. 05

    Step 5: Utility permission to run

    The utility has the last word before the system is turned on.

How pricing works for this job

  • What decides the price

    What changes the price of the wiring side of solar and a battery.

    • How many sources and how far apart

    • The size of the battery and inverter

    • Whether the panel must be replaced to take them

    • Permit, inspection and utility fees

  • What the estimate includes, and what it doesn't

    The estimate is written and names what it covers: labor, wire, boxes, the panel and disconnects. It also names what it leaves out.

    • Left out unless the estimate says otherwise: trenching, drywall repair, painting

    • Panels, batteries and inverters are listed by line, whether we buy them or you do

    • Permit fees are passed through at cost, on their own line

  • What the design fee covers

    For a whole-house or off-grid system we draw the one-line diagram and a load worksheet first. That drawing is the design fee.

    • One sheet: sources, switches, breakers and loads, with wire sizes

    • You keep the drawing, and your inspector gets a copy

    • The fee is credited to the work if you hire us to build it

  • Materials and who buys them

    You can buy panels, batteries and an inverter yourself. We tell you before you order if a part is one we're not willing to install.

    • We write the list of parts with sizes and ratings

    • Lead times for batteries can be long, so we ask early

    • Anything you supply is listed on the estimate as owner-supplied

Questions about this job

Will the battery run my whole house?

It depends on the battery and on what you run. We write down what it carries, hour by hour, and say what it does not.

Are there rebates?

Some utilities and programs offer them, and they change. Ask your utility first, and we will tell you what paperwork each one asks for.

Who does the roof or ground work?

We wire. Your solar installer or you handle mounting. We will say what we need done before we arrive.

Tell us about the site

Where it is, how you get there, what is built so far.